Skip To Content


Latest News

Oakland Street Water Main Shutdown Oct. 5

On Tuesday, October 5, 2021 the water main on Oakland Street between Gill and Grand River will be shut down.  In preparation of the water shutdown, we recommend residents fill their bath tubs with water and use a bucket of water to flush their toilets as needed.
 
This shutdown will take place between 7 a.m. - 6 p.m. Please notify one of the contacts below if your water service is out for more than five hours.
 
There is a possibility that some sediment may be stirred up in the existing service when the water is turned back on. If your water is cloudy or there is sediment, you may need to clean your screens at sink faucets, or flush cold water through a large fixture until it clears up. If the problem persists, please contact the engineering firm at the number below so the problem can be assessed.
 
Please keep children and pets away from the construction operation.  Construction
activities, and the associated equipment that goes with it, is attractive to small children and can be dangerous. Please keep children away from the equipment, removals, mass grading, underground utility installation, hot/fresh asphalt, and wet concrete.
 
If you have any specific questions regarding this shutdown, please call Mr. Michael McNutt, Project Inspector for OHM, at (313) 516-4735, Mr. Austin Downie, Engineer for OHM, at (734) 466-4437, Mr. Chuck Eudy, DPW Superintendent, Mr. Josh Leach, DPW Assistant Superintendent, at (248) 473-7250, or Mr. Nick Higgins, V.I.L. Construction Underground Superintendent, at (586) 405-5793.
 

 

 

 

All Latest News ...