Smithfield Road Concrete Reconstruction

April 23, 2021 UPDATE

Beginning Monday, April 26 (weather permitting), the concrete along the west side of Smithfield will be removed and replaced.  Only southbound traffic will be permitted.  There is no change in detour.  Please click her to review the detour.


On Monday, April 19th, 2021 concrete reconstruction of a section of Smithfield Road will begin (weather depending). The limits of this construction project extend from the Briar Ridge Lane intersection to just south of the driveway at 35782 Smithfield. During this project, all southbound traffic will be permitted on Smithfield, however, all northbound traffic on Smithfield will be closed between Stonehouse Court and Briar Ridge Lane. Please be aware that driveway closures for those directly within the project limits will be necessary during the project and those residents will be contacted prior to those anticipated closures.

Please reference the attached diagram outlining the proposed traffic plan for the project.  The arrows indicate the proposed traffic direction (please click here to review traffic plan).

If you would like to read the full Smithfield Road contruction notice, please click here.