Skip To Content


Latest News

Grand River Construction

From May 15 to May 22, 6 AM to 6 PM, the sidewalk at each intersection listed below will be closed for replacement -- the side streets will be maintained while we work.

  • Grove Street
  • School Street
  • Power Street (North side)
  • Lilac Street
  • Hawthorn Street
  • Smithfield Street
  • Muirwood Street
Please note that there will be a single right lane closure on westbound Grand River from 9 AM to 3 PM at Power Road during the same dates.
 
And:

The sidewalk at each intersection listed below will be closed for replacement:
  • Tuck Road
  • Violet Road
  • Mooney Road
  • Lakeway Road
  • Shiawassee Road (north side)
  • Oakland Street
  • Liberty Street
  • 9 Mile Road
  • Freedom Road
  • Grove Street
  • Farmington Road (north side)
  • Halsted Road (north side)
The work will occur daily from 6 Am to 6 PM from May 22, 2017 to May 26, 2017. Side streets will be maintained while we work. There will be right turn lane closures at the major intersections to Grand River Avenue.

Please note that there will be intermittent single right lane closures on east bound and westbound Grand River from 9 AM to 3 PM while we work at each location.
 

 

 

 

All Latest News ...